Before, during and after shots of the turnpike

Before, during and after shots of the turnpike

Today, a crew returns from a hitch working in Manti-LaSal National Forest in Utah. The 8-day project initially focused on repairing a turnpike on the Josephite Point Trail, with the crew then moving to work on a reroute and construction of log drainage structures along the Castle Valley Ridge Trail.

The Manti LaSal crew's morning commute

The Manti LaSal crew’s morning commute

The reparation of the turnpike was a team effort. First, the old logs had to be removed and the rebar had to be salvaged. Next, sawyers felled trees that were the correct diameter for use in the construction of the retaining walls, and then cut them to 10 1/2 feet.

Sawyers cut trees of the correct diameter

Sawyers cut trees of the correct diameter

Crew members stripped the bark from the logs, a technique which will help them to withstand rot for a longer duration. Next the logs were hauled to the trail, and pounded into place with the salvaged rebar.

Drilling the harvested logs to insert the rebar

Drilling the harvested logs to insert the rebar

The project was important because the section of the trail that included the turnpike was a meadow that retained water easily during heavy rains, and the trail could be rendered impassable if it wasn’t reinforced. The crew’s efforts will ensure that visitors to the National Forest can have an enjoyable and safe experience.

High five for a job well done!

High five for a job well done!

Skip to content